Unfortunately we haven't had a chance to take pictures, but this was an exciting and busy weekend. We ended up having multiple unexpected leaks in the house.
Leak #1: Our kitchen faucet hose was getting pretty frayed so we decided to replace it. Simple plumbing task, right? Well, maybe for an actual plumber. Dan successfully removed the old hose and successfully attached the new hose. Unfortunately the new hose leaked from both the supply and faucet connections. Not good.
Leak #2: Jen and I had just finished putting Tyler down for a nap and we were standing out in the hallway on the 3rd floor when we noticed water starting to trickle down the wall from the light switch. That of course meant our water heater was leaking directly above us. The good news was that it wasn't the water heater, it was the hot water pipe out of the water heater it had ruptured, so we spent a lot of time cleaning up and emptying the tank out with 1 gallon buckets.
Leak #3: Tyler is officially a big boy. A few weeks ago Jen bought the potty training equipment. We have been having him sit down on his little boy potty for a while and then he reads his Elmo Potty book. Well, on Saturday Tyler used the potty for the first time and has since done it 4 times. We have a long way to go but this has been a very exciting step.
We got leaks 1 & 2 fixed this morning for what I'm sure will be a princely sum by a real plumber. Leak #3, we hope, will continue.